Coming soonRidhi Road & Rails Pvt Ltd is launching shortly. Rail works and civil infrastructure.
Coming soonRail works and civil infrastructure · New Delhi

Rails that keep India moving.

Track, formation and civil works for rail corridors and sidings, built with the plant, crews and track record of the C P Arora group.

KM 001 · Who we are

We are the rail arm of the C P Arora group. We take the group's experience in highways and airport runways and turn it into track and civil works that open on time and stay open.

Track laying machine placing sleepers and rail
0+years of group experience
0hyva tippers in the group fleet
–km of track, coming soon
–projects, coming soon
KM 040 · Services

Everything between the survey and the final coat.

01

Track laying

Sleeper and rail laying, fastening and linking for new lines and doubling.

02

Formation and earthwork

Embankments, cuttings and subgrade prepared and compacted for the track.

03

Ballast and tamping

Ballast spreading, packing and tamping to bring the track to level.

04

Sidings and yards

Goods sidings, yard tracks and turnouts for industry and freight.

05

Corridor civil works

Culverts, drains, boundary works and access roads along the rail corridor.

KM 120 · Our work

On site, every day.

Illustrative images. Ridhi project listings will be added as they are delivered.

Track laying
01Track laying
Formation and ballast
02Formation and ballast
Track tamping
03Track tamping
Double line corridor
04Double line corridor
Sidings and yards
05Sidings and yards
Track at sunrise
06Track at sunrise
KM 180 · The route

How a project runs.

  1. 1

    Survey and plan

    We walk the alignment, test the ground and agree a programme before mobilising.

  2. 2

    Mobilise plant

    Track machines, ballast and the construction fleet move to site.

  3. 3

    Build and align

    Formation, ballast and track are laid and checked for level and gauge.

  4. 4

    Open and maintain

    Handover on schedule, with maintenance support after opening.

KM 220 · Questions

Before you ask.

What does Ridhi Road & Rails do?

We build rail infrastructure: track laying, formation, ballast and civil works for corridors and sidings. We are part of the C P Arora group.

Which regions do you work in?

Delhi NCR to begin with. We mobilise across states for the right project.

Do you own your equipment?

The group runs its own plant and a large fleet of tippers and earthmoving machines.

Can you work near live tracks?

Yes. Works near live lines are planned around traffic blocks, with safety supervision and night shifts where needed.

How do I request a quote?

Use the form below with the project location and scope. The estimating team replies within two working days.

Do you take subcontract packages?

We take both full contracts and specific packages such as formation, ballast or sidings.

KM 250 · Destination

Let us build the line.

Share the location, length and scope. We reply within two working days with a plan and a rate.

  • Ridhiroadrails@gmail.com
  • +91 87965 56099
  • +91 11 4306 3554
  • +91 11 4308 2258
  • Ridhi Road & Rails Pvt Ltd
  • 2A, Rama Road, Najafgarh Road Industrial Area, New Delhi 110015